About the project
- Date: 23 Nov 2023
- Status: On Going
A 30% more efficient boiler system was commissioned and CO2 emissions were measured online in the flue gas treatment system with fully automatic combustion efficiency control. Inefficient boilers with old technology (65%) installed for the steam and hot water needed by the dyeing and finishing plants were replaced with high efficiency (95%) fully automated boilers with online measurement control of flue gas, aiming to use less coal per unit steam.